跳到主要内容

v0.1.5 Changelog

· 阅读需 2 分钟
BeiShan_Besson
Mod Developer

终末地工业模组 v0.1.5 更新日志

Endfield Industry Mod v0.1.5 changelog.

NeoForge 更新日志 / NeoForge Changelog

2025-11-23

  • 基本内容移植完成
  • Basic content porting completed

2025-11-15

  • NeoForge版移植工作开始
  • Start porting to NeoForge version

Forge 更新日志 / Forge Changelog

2025-11-23

  • 优化供电桩逻辑,现在供电桩只会在放置时,只进行一次搜索,搜索半径30格范围内的协议核心中继器,如果找到,则会把顶端的连接线渲染出来
  • Optimized the logic of Electric Pylon. Now, the Electric Pylon will only perform a one-time search upon placement, searching for Protocol Anchor Core or Relay Tower within a 30-block radius. If found, it will render the top connection line.
  • 进一步优化协议核心的性能,移除了方块本身的tick方法,全部交给全局电网管理系统处理
  • Further optimized the performance of Protocol Anchor Core by removing the block's own tick method and delegating all processing to the Global Power Grid Management System.

2025-11-11

  • 测试验证FE转换单元
  • Tested and verified FE Converter

Fabric 更新日志 / Fabric Changelog

2025-11-19

  • 优化供电桩逻辑,现在供电桩只会在放置时,只进行一次搜索,搜索半径30格范围内的协议核心中继器,如果找到,则会把顶端的连接线渲染出来
  • Optimized the logic of Electric Pylon. Now, the Electric Pylon will only perform a one-time search upon placement, searching for Protocol Anchor Core or Relay Tower within a 30-block radius. If found, it will render the top connection line.

2025-11-18

  • 进一步优化协议核心的性能,移除了方块本身的tick方法,全部交给全局电网管理系统处理
  • Further optimized the performance of Protocol Anchor Core by removing the block's own tick method and delegating all processing to the Global Power Grid Management System.